Sales: [email protected] · WhatsApp +86 136 4542 9121 — CE-certified packaging machinery since 2008
SunAura Packaging Machines

Cartoning Machine Maintenance & Service Guide

Precision packaging machinery, engineered and built in Qingdao, China since 2008.

Chapter 09

Cartoning Machine Maintenance & Service Guide

Cartoners erect a folded carton, load the product (manual, automatic or with a bucket infeed) and close/tuck or glue the flaps. They combine a carton blank pickup, a flighted chain, flap-opening guides and a closing or gluing station — timing between these is the heart of the machine.

ZH seriesFlighted bucket chainTuck or hot-melt closeServo options

Models covered

Model Type Typical application
ZH-200 Intermittent cartoner Pharma, food, small goods cartons
ZH-250P Automatic servo cartoner Higher-speed, fast changeover

Maintenance schedule (add to master schedule)

Freq. Task Standard
D Clean flights, guides, pickup and closure stations No paper dust/glue build-up
W Inspect vacuum cups, chain tension and flap guides Cups good; correct chain tension
M Lubricate main chain, cam and bearings; check timing NLGI #2; synchronized stations
M Hot-melt: clean nozzle/tank, check temperature; tuck: check guides Clean glue; flaps fold cleanly
Q Replace cups, worn chain/belts and closure tooling as needed Per wear list
A Gearbox, full cam timing, electrical and program backup Per annual tasks

Wear parts

  • Vacuum cups & filter; flighted/bucket chain and sprockets; carton-pickup suction.
  • Flap-opening and closing guide wear strips; tuck blades/fingers.
  • Hot-melt nozzle/filter/hose; drive belts; sensors.

Troubleshooting

Symptom Likely cause Remedy
Carton not erected / opens late Vacuum pickup, flap guides, magazine setting Replace cups; adjust guides/magazine
Product won’t load / jams at push Carton not square, timing offset, product oversize Re-time load; check carton/product size
Flaps not closing / poor tuck Guide wear, mis-adjusted tuck fingers, glue fault Adjust/replace guides; check glue
Glue failure / stringing Temperature, nozzle, adhesive grade, char Set temp; clean nozzle; correct adhesive
Chain stalls / overload Jam, chain tension, worn sprockets Clear jam; tension/replace chain
WHEN TO CALL SUNAURAOperator-level: loading, cups/chain/guide adjustment, glue cleaning and changeover. Call service for cam/encoder timing faults, servo alarms or recurring loading/closure faults after setup is verified.