Sales: [email protected] · WhatsApp +86 136 4542 9121 — CE-certified packaging machinery since 2008
SunAura Packaging Machines

Packaging Machinery Maintenance & Service Manual

Precision packaging machinery, engineered and built in Qingdao, China since 2008.

MAINTENANCE & SERVICE MANUAL · 2026 EDITION

Packaging Machinery Maintenance & Service Manual

The practical field guide to keeping SunAura Packaging Machines packaging equipment running — daily inspections, lubrication points, wear-part replacement, troubleshooting and service procedures for every machine family and model we build.

11 machine family chapters90+ models covered5 service intervals38-pg catalog cross-ref

00 · Scope

What this manual covers

This manual is written for line operators, maintenance technicians and plant engineers who run SunAura Packaging Machines packaging equipment. It is organized by machine family because machines within a family share the same drives, sealing systems, pneumatics and service points — even when frame sizes and speeds differ.

Every model in the SunAura Packaging Machines Packaging Machinery Catalog is mapped to a family chapter through a model coverage table. If you know your model number (printed on the machine nameplate and in the catalog), use the index below to jump straight to the correct chapter. Each chapter follows the same layout so you can find a procedure in under a minute on the factory floor:

A

Maintenance schedule

Daily, weekly, monthly, quarterly and annual tasks with intervals and responsible role.

B

Lubrication chart

Every lubrication point, the correct grease or oil grade, quantity and frequency.

C

Wear parts list

Knives, seals, belts, heaters, suction cups and sensors that need periodic replacement.

D

Service procedures

Step-by-step instructions for the jobs technicians perform most often.

E

Troubleshooting

Symptom → likely cause → remedy tables for the faults we see in service.

F

When to call us

Which jobs are operator-level and which require a SunAura Packaging Machines service engineer.

Model & chapter index

ABOUT YOUR MODEL NUMBERSunAura Packaging Machines model numbers begin with a family prefix (e.g. CX-30T, MH-FG-2300A, YTB-B2000). The prefix identifies the family; the trailing numbers usually encode frame size, speed or configuration. The YS- prefix on some nameplates is the SunAura Packaging Machines internal series code and is cross-referenced in every coverage table.

01 · How To Use

How to use this manual

  1. Identify your machine. Read the model and serial number from the nameplate (usually on the electrical cabinet or infeed side). Note the electrical supply and build year.
  2. Find the family chapter using the index above, then confirm your exact model appears in that chapter’s coverage table.
  3. Start with the schedule. Most faults on packaging lines trace back to skipped daily cleaning or overdue lubrication. Work through the interval that matches the machine’s running hours.
  4. For a fault, go to troubleshooting and match the symptom. Work causes top-to-bottom — the first rows are the most common and the quickest to check.
  5. Before ordering parts, quote the serial number. Some wear parts (heaters, knives, belts) differ between frame sizes even within one family.

Running-hour basis

Intervals assume a two-shift operation (~16 h/day, ~250 days/year). On single-shift lines you may extend calendar intervals; on three-shift or 24/7 lines, shorten them by roughly one third.

Keep a service log

Record date, running hours, parts replaced and technician. A completed log protects the warranty and makes repeat faults easy to diagnose. A blank log template is available from SunAura Packaging Machines service.

Genuine parts

Use SunAura Packaging Machines genuine wear parts and approved lubricants. Sealing temperature, knife geometry and belt tension are tuned to original specifications; substitutes are the most common cause of the call-outs we receive.

02 · Safety

Safety rules & lockout / tagout

Packaging machines combine heat, knives, moving conveyors, pneumatics and (on robotic cells) fast-moving arms. No maintenance task is urgent enough to bypass these rules.

DANGER — ISOLATE ENERGY BEFORE GUARDS ARE OPENEDBefore clearing a jam, changing a knife, cleaning a sealing jaw or working inside any guard: press stop, switch the main isolator to OFF, apply your personal padlock/tag, and confirm the machine cannot restart. For pneumatic machines, shut off and vent air to 0 MPa. For robotic cells, follow the cell-specific lockout and never enter the safeguarded space while the controller is energized.

The eight rules on every SunAura Packaging Machines line

  1. Only trained, authorized operators may run or service the machine.
  2. Keep all guards, interlocks, e-stops and light curtains in place and functioning — never bypass or wedge an interlock.
  3. Tie back long hair, no loose sleeves or jewellery; wear the PPE specified for the task (heat-resistant gloves for sealing parts, eye protection for cleaning and compressed air).
  4. Assume sealing jaws, knives and shrink tunnels are hot until verified. Allow heat-seal parts to cool or use a temperature probe.
  5. Never reach into a machine to clear a product while it is running — stop it first. Restart only after everyone is clear and guards are closed.
  6. During maintenance use lockout/tagout; release stored energy (springs, pneumatic pressure, gravity-loaded arms, capacitated drives).
  7. Keep the area around the machine clean, dry and free of film scrap, tape off-cuts and oil — slip and trip hazards cause more reportable injuries than the machines.
  8. Know the e-stop positions, fire extinguisher and emergency exits before starting a shift.

Lockout / tagout sequence

  1. Complete the current cycle, press STOP and let moving parts come to rest.
  2. Switch the main electrical isolator OFF and fit your personal padlock and tag.
  3. Close the air isolation valve, vent the circuit to 0 MPa and lock the valve where fitted.
  4. For heated machines, switch off heaters and wait until jaws/tunnel are below 50 °C.
  5. Try to start the machine (zero-energy verification) — it must not move or energize.
  6. Perform the work, then remove tools, refit guards, and only the person who applied a lock removes it.

03 · Master Schedule

Master maintenance schedule

These are the tasks common to all motorized SunAura Packaging Machines. Family-specific jobs (knife timing, jaw pressure, film carriage, robot grease, etc.) are added in each chapter. Frequency codes: D daily/shift, W weekly, M monthly, Q quarterly, A annual.

Freq. Task Check / standard Role
D Clean machine, remove film/tape/carton scrap from conveyors, jaws, knives and sensors No build-up; photoeyes unobstructed Operator
D Inspect sealing faces, blades and belts for damage or product residue Clean, undamaged Operator
D Check air pressure and drain compressor water / filter-regulator 0.5–0.7 MPa; no water in bowl Operator
D Test e-stops, guards and interlocks respond correctly Machine stops instantly Operator
W Check belt and chain tension; listen for bearing/gearbox noise No slip, no abnormal noise Maintenance
W Inspect pneumatic fittings, hoses and cylinders for leaks No audible leak Maintenance
W Clean/verify all photoeyes, labels and reflector surfaces Reliable detection Maintenance
M Lubricate per the lubrication chart; top up gearboxes as specified Correct grade, correct quantity Maintenance
M Check electrical terminals, cable glands and cabinet cooling fans Tight, clean, dry, cool Electrician
M Inspect heaters, thermocouples and temperature control accuracy Holds setpoint ±5 °C Maintenance
Q Replace worn wear parts before failure (belts, suction cups, Teflon tape) Per family wear list Maintenance
Q Re-check timing, jaw pressure, knife and seal alignment on wrapper/sealer Per chapter procedure Technician
A Gearbox oil condition/change; bearing repack; full mechanical inspection Per lubrication chart Technician
A Electrical insulation, earth continuity and full safety-function test Per local standard Electrician
A Back up / verify drive and PLC parameters; torque-check terminals Parameters archived Electrician
RUNNING HOURS BEAT THE CALENDARIf a machine reaches the running-hour limit before the calendar interval, service it then. Sealer and wrapper sealing systems on high-speed lines commonly need cleaning and wear-part checks well before the printed monthly interval.

04 · Lubrication

Lubrication standards & approved consumables

Using the correct lubricant matters as much as lubricating at all. Too light an oil fails under load; too heavy a grease drags cold drives and blocks auto-lube lines. These are the default grades SunAura Packaging Machines specifies; a machine’s own nameplate or lubrication chart overrides them.

Application Specification Notes
General bearings, pivots, slides NLGI #2 lithium-based multi-purpose grease EP grade for loaded points; −20 to +120 °C
High-temperature points near sealers/tunnels NLGI #2 high-temp / synthetic EP grease For points running above ~100 °C
Gearboxes (worm/helical) ISO VG 46 or VG 68 industrial gear oil Grade per nameplate; check level, don’t overfill
Chains (conveyor, film feed) Chain oil / light ISO VG 68, or chain spray Wipe excess to avoid contaminating film
Pneumatic system Clean, dry compressed air; FRL lubricator only where specified 0.5–0.7 MPa; most modern valves are oil-free — do not add oil unless specified
Linear guides & ball screws (robots, servo axes) Manufacturer-specified #2 grease Keep wipers intact; contamination destroys guides
Food / pharmaceutical contact areas

NSF H1 registered lubricant where product contact is possible Specify at order; machines are configured accordingly

Golden rules

  • Clean before you grease. Wipe the fitting and surrounding area; pumping grease onto dirt forces it into the bearing.
  • More is not better. Fill until fresh grease just appears at the seal; over-greasing blows seals and drags drives.
  • Don’t mix greases. Different thickeners (lithium, polyurea, clay) can react and soften. If unsure, purge and repack.
  • Oil-lubricated gearboxes: check level at the sight glass with the machine level and stopped; change oil if milky, dark or metallic.

16 · Spare Parts

Ordering spare parts

Fast repairs start with the right information. When requesting parts, always quote the machine model and serial number so we supply the correct frame-specific item — heaters, knives, belts and tape heads differ between sizes.

Recommended spare-parts stock

Category Suggested stock Typical items
Sealing / heating 1–2 sets Heating elements, thermocouples, Teflon tape/covers, jaw inserts
Cutting 1–2 each Cut-off knives/blades and anvils
Belting 1 each Drive belts, conveyor/tunnel belts, chains
Vacuum / pneumatic Kit Suction cups, vacuum filters, fittings/tubing, grippers
Taping / gluing As used Tape blades & rollers, hot-melt nozzles/filters
Electrical / sensors Key items Fuses, contactors, photoeyes, relays

To order, contact SunAura Packaging Machines service with your model and serial number and the part description (or part number from the machine documentation). We can also advise a machine-specific recommended spares list at commissioning.

17 · Warranty & Service

Warranty, support & contacting service

SunAura Packaging Machines supports the equipment we build through commissioning, operator training, genuine spare parts and remote/on-site service. Keeping to the maintenance schedule and using approved parts and lubricants protects your warranty and gives the longest, most reliable machine life.

Before you call

Note the model & serial number, the alarm/fault code, when it started, and what changed (product, film, changeover). Check the matching troubleshooting table — most calls are resolved there.

Remote & on-site support

Connected machines allow remote diagnostics; where an on-site visit is needed we arrange a service engineer and parts. Commissioning, training and scheduled maintenance plans are available.

Service contact

SunAura Packaging Machines, Building 2, No.407 Huaihe West Road, Huangdao, Qingdao, China.
Tel / WhatsApp: +86 136 4542 9121
Service: +86 131 5322 3342
Email: [email protected]

GOOD MAINTENANCE IS THE BEST WARRANTYThe majority of unplanned stops we attend are preventable — skipped cleaning, overdue lubrication, non-genuine wear parts, or running the wrong film/strap/tape. Following this manual costs a few minutes a shift and saves hours of downtime.