EU Machinery Regulation 2023/1230: what end-of-line buyers should check before the 2027 deadline

Technical Knowledge

Nov 10, 2026 SunAura Engineering Team

TL;DR. Regulation (EU) 2023/1230 was adopted on 14 June 2023 and becomes mandatory on 20 January 2027, replacing the old Machinery Directive 2006/42/EC. For anyone buying palletizers, stretch wrappers, case sealers, cartoners or inline strapping machines for a European plant, the practical change is not a new CE logo but a thicker conformity file: AI-driven safety functions, cyber-safety for compliance-relevant software and data, fully digital instructions, and a new “individual test” route for higher-risk machines. Importers and distributors take on real obligations, and used or grey-imported equipment gets harder to place on the EU market. This article walks the timeline, the paperwork you should now ask suppliers for, the linked standards (ISO 12100, ISO 13849-1), what changes for second-hand machines, and gives you a short list of buying-decision checks to run before you sign a PO in late 2026.

By Grace Wu, Quality & Compliance Engineer — Standards & Testing. Grace reviews FAT documentation, CE/UL conformity files and export compliance for end-of-line machinery.

Why this matters to you in 2026

If you are sourcing end-of-line equipment for a plant that ships into or operates inside the European Union, you have roughly fourteen months between now and the date the new regulation bites. That is not a long runway when a typical palletizer or stretch wrapper line takes six to nine months to design, build, FAT, ship, install and commission. A machine ordered in late 2026 and delivered in mid-2027 had better be built to the new rule set, not the old one. We see this on the floor when a procurement team signs on a price sheet that still references “CE per 2006/42/EC” and the site team finds out at commissioning that the Declaration of Conformity on file no longer matches what a market-surveillance inspector would accept.

The shift from a directive to a regulation is the headline structural change. Directives are transposed into national law by each member state, which historically produced small differences in how Germany, France, Italy and Poland interpreted essential health and safety requirements. A regulation applies uniformly on day one in every member state. That simplifies cross-border enforcement but removes the wiggle room buyers used to negotiate around. The machine you put on the market in Helsinki in February 2027 must meet the same written text as the one you put on the market in Madrid.

The timeline in plain terms

Regulation (EU) 2023/1230 was formally adopted on 14 June 2023. It entered into force 20 days after publication, which is the standard Treaty on the Functioning of the European Union rhythm for EU regulations. The important date for buyers and suppliers is 20 January 2027: that is the date of mandatory application. From that date, manufacturers must place machinery on the EU market only in conformity with the new regulation, and the old Directive 2006/42/EC is repealed. Council Directive 73/361/EEC — the older measure that covered wire rope for lifting accessories — is also repealed, which matters if your end-of-line cell feeds into an infeed lift or a pallet hoist that uses wire rope as a load component.

The transition logic is the standard one. Machinery that was placed on the market before 20 January 2027 continues to circulate under the old directive. So a palletizer you bought in 2025 and commissioned in 2026 does not need to be re-certified the day the new rule lands. But a machine that is placed on the market on or after 20 January 2027 — meaning the first time it is made available for distribution or use on the EU market — must satisfy the new regulation. For a buyer ordering a new line in late 2026, you should be asking the supplier which rule set they intend to certify against, and getting that written into the contract. There is no automatic grandfathering for equipment still in production on that date.

We recommend you treat 20 January 2027 as the hard line and work backwards. If your line needs to be running by Q3 2027, the equipment must be delivered and accepted well before that, which means the technical file should already reflect the new regulation by the time you issue your purchase order in late 2026. A supplier who tells you “we’ll CE it under the old directive, it’ll be fine” is taking a risk that your legal team will inherit.

What “placed on the market” actually means

This phrase trips people up. “Placing on the market” is the first time a product is made available within the EU territory, whether for sale or for use. It is not tied to the date you receive the machine, or the date it is plugged in. It is the date the manufacturer (or importer) releases it from their supply chain into the EU. For a single machine made to order for your plant, that is effectively the handover date at your dock.

Two consequences follow. First, a machine shipped to your site on 19 January 2027 can be certified under the old directive; a machine shipped on 21 January 2027 must be under the new regulation. Two days of difference, two different legal regimes. Second, “making available on the market” is a separate concept from “putting into service.” You can take delivery of a machine under either regime and then install it later, but the certification baseline is fixed at the moment it enters the EU supply chain. Used-equipment dealers watch this date closely, because inventory sitting in a European warehouse on 20 January 2027 gets a different legal treatment than inventory that arrives from outside the EU on 21 January.

The technical shifts that affect end-of-line machinery

The regulation does not just relabel the old rules. It updates the essential health and safety requirements for how machinery is designed and documented. Three changes matter most to end-of-line buyers.

AI-powered safety functions

The new text integrates provisions for machinery that uses AI in its safety functions. This is not a general “AI is allowed” clause. It is a recognition that modern safety-related control loops increasingly use learned models — for example, a vision-based presence-sensing device that distinguishes a hand from a passing carton on a case sealer infeed, or a robot cell that adapts its speed based on observed operator behavior. Under the old directive, suppliers typically treated these systems as “information technology” and wrote the safety case around the hardwired emergency stop and light curtain, with the vision layer described only as a productivity feature. The new regulation makes clear that if an AI model contributes to a safety function, it has to be assessed and documented as part of that function.

For buyers, the practical ask is simple: when a supplier pitches a “smart” safety feature — vision-based safe speed, adaptive guarding, AI-driven load detection on a palletizer — ask them which part of the control loop it sits in, what performance level they claim under ISO 13849-1, and whether that claim is backed by validation data or by marketing. We see this on vision-guided palletizing cells where the robot picks random cartons from a mixed infeed; the vision system is usually a productivity tool, not a safety tool, and should not be sold to you as a safety function. But when the vision system is also what decides whether the door can be unlocked, the documentation burden goes up.

Cyber-safety for compliance-relevant software and data

Second, the regulation adds cyber-safety requirements for software, data and control systems that are relevant to compliance. This is a direct response to how modern end-of-line machines are built: PLCs with remote maintenance, safety controllers with over-the-network parameter updates, HMI panels connected to the plant network, and machines that phone home for diagnostics. Under the old directive, a supplier could ship a machine with an open engineering port and a default password on the assumption that the customer’s IT team would lock it down. The new regulation makes the manufacturer responsible for designing out foreseeable cyber threats that could compromise safety.

This is where the line between OT and IT gets blurry. A malware infection that stops a line is an IT problem. A malware infection that changes a safety parameter — for example, raising the muting time on a stretch wrapper light curtain so it no longer detects an operator walking under the film carriage — is a safety problem, and the manufacturer is now on the hook for it. Expect suppliers to start shipping machines with signed firmware updates, role-based access on the safety controller, network segregation recommendations, and documented threat assessments. If you are buying a connected line, this dovetails with the kind of OPC UA / WMS / MES integration we cover in our piece on connected end-of-line machines and OPC UA; the same network you use for production data is the network a regulator will ask about when they inspect the safety architecture.

Digital instructions and digital Declaration of Conformity

Third, the regulation clarifies that instructions for use and the Declaration of Conformity can be delivered in digital form. This sounds like paperwork trivia until you have dealt with a 1,200-page manual for a robotic palletizer printed on a forklift pallet. The old directive’s wording left national inspectors uncertain about whether a PDF on a USB stick counted as “the instructions.” The new text accepts electronic delivery, including machine-readable formats, as long as the information is accessible to the end user for the lifetime of the machine. Paper is no longer mandatory.

For buyers, this is mostly good news. It means you can get your FAT files, risk assessments, circuit diagrams and DoC in a structured digital package that your site engineering team can search. It also means you should specify in your contract how long the supplier will host or provide those digital documents — typical expectation is the lifetime of the equipment, which for a case sealer or cartoner is ten to fifteen years. Ask where the files live after the supplier is acquired or goes out of business; that question is more common than you would think.

The “individual test” route for higher-risk machinery

The regulation adds a conformity assessment path called the “individual test.” This is relevant when a machine is higher-risk but does not fall neatly into the harmonized Annex IV-style list of the old directive. Rather than running the full type-examination cycle, a notified body can assess a single machine on its own merits — design, construction, test results, safety logic — and issue a certificate for that specific unit.

For end-of-line equipment, this matters mainly for large custom cells: a high-level robotic palletizer integrated with an infeed conveyor, stretch wrapper, label applicator and load-out conveyor as one interconnected installation, or a cartoner integrated with a vision inspection station and reject diverter. A standard off-the-shelf case sealer or inline strapping machine sold to thousands of customers will still go through the standard internal-control route with harmonized standards. But a one-off integrated system where the manufacturer cannot rely on a generic module certificate may now use the individual-test path. Buyers of custom integrated lines should ask whether the supplier intends to go this route, who the notified body is, and what the lead time adds. It typically adds four to eight weeks to a project schedule, which is exactly the kind of thing that ruins a production cutover plan.

What importers and distributors now have to do

The old directive already held importers and distributors to account. The new regulation sharpens it. An importer — meaning anyone who brings a machine from outside the EU into the EU market — must verify that the manufacturer has carried out the correct conformity assessment, that the CE marking is applied, that the documentation exists, and that instructions are provided in the language of the member state where the machine is sold. The importer must also keep a copy of the Declaration of Conformity available for market surveillance authorities.

A distributor — a European reseller who does not manufacture but holds stock — must verify that the manufacturer and importer have met their obligations, store the machine in a way that does not compromise safety, and forward manufacturer complaints to the supply chain. This sounds like middle-office hygiene, but it changes how you buy if you are a plant engineer in Europe sourcing from a non-EU builder. You should ask your importer or distributor: do you hold the technical file, do you verify the DoC against the actual serial number, and what language are the instructions in? Under the new regime, a distributor who sells you a machine with a single English manual in France is now more exposed than they were under the old directive, and that exposure gets passed back to you as the end user during a market-surveillance visit.

How this lands on five end-of-line machine types

Palletizers

A high-speed robotic palletizer is the machine type where most of the new compliance work shows up. It combines a robot, a safety controller, often vision-based product detection, remote diagnostics, and a load-handling zone that operators walk into. Under the new regulation, the safety function that stops the robot when a guard is breached must be documented under ISO 13849-1 with a defined performance level; if the safety loop includes a vision sensor, that sensor has to be part of the safety argument, not a footnote. Cybersecurity matters here because the robot controller is typically networked to the plant SCADA. If you are specifying a palletizer, ask for the safety manual’s performance-level table, the list of safety-related functions and their PL ratings, and the network architecture diagram showing which ports are open by default.

Stretch wrappers

A stretch wrapper looks simple — a turntable or rotary arm, a film carriage, a load — but the load can weigh more than a ton, and the film carriage moves at speed. The safety case is mostly about the guarding around the rotating load zone, the emergency-stop circuit, and the film-cutting mechanism. Under the new regulation, the cyber-safety ask is real because modern wrappers ship with PLC-based recipe storage, weigh-scale integration, and optional remote monitoring. If your wrapper is networked, the supplier should be able to show how a remote firmware update cannot silently change the safety interlock timing.

Case sealers

A case sealer is the closest thing to a commodity end-of-line machine. It has pinch points at the tape head and infeed, but it is not high-energy. Most case sealers fall under the standard internal-control route with harmonized standards. The compliance ask for a buyer is light: confirm the CE DoC references the new regulation from 20 January 2027 onward, confirm the instructions are in your language, and check that the guard interlocks are documented. Where it gets interesting is when a case sealer is integrated into a larger line with accumulation, vision rejection, or coded packaging; the integrated system’s safety case is broader than the individual sealer’s.

Cartoners

A cartoner has reciprocating motion — tuckers, fold-ears, plungers — and often integrates vision-based code reading or product inspection. The safety argument is about the guarding around reciprocating heads and the interlocked access panels. Under the new regulation, if the cartoner uses machine vision to detect missing product and trigger a rejection, that vision loop is a productivity function, not a safety function, but buyers should make sure the supplier documents the distinction clearly. We see buyers occasionally assume a vision system is a safety device because it “sees” something; that is a dangerous mix-up, and the new regulation’s treatment of AI safety functions makes it more important, not less, to ask where the boundary is.

Inline strapping machines

A strapping machine forms a tensioned loop of steel or poly strap around a pallet or bundle. The tensioning head generates high force, and the seal/cut mechanism is a pinch point. Compliance is straightforward here for a standard inline unit; the new regulation does not change the fundamental safety case. But if you are buying a strapping cell integrated with a palletizer and wrapper as a single load-out system, the integrated safety logic — e-stop zones, muting sequences, guard interlock logic across the whole cell — is where the conformity assessment gets detailed.

Linked standards: ISO 12100 and ISO 13849-1

The regulation does not sit alone. It points to harmonized standards, and the two foundational ones for end-of-line machinery are ISO 12100 and ISO 13849-1. You do not need to read them cover to cover, but you should know what each one is asking for when you review a supplier’s technical file.

ISO 12100 is the risk-assessment standard. It is the systematic method a supplier should follow to identify hazards, estimate risk, reduce risk, and document the residual risk. Typical expectation is a risk-assessment matrix that lists each hazard — infeed pinch point, rotating turntable, reciprocating plunger, moving film carriage, load drop — along with the severity, frequency, and probability of harm, and the mitigation chosen. If a supplier’s technical file contains a single generic “risk assessment” page with no per-hazard breakdown, that is a red flag under either the old directive or the new regulation, but the new regime’s market-surveillance climate makes it more likely to be challenged.

ISO 13849-1 is the safety-control-systems standard. It rates the performance of safety-related parts of the control system from PL a (lowest) to PL e (highest). For a palletizer cell with a robot that moves at speed near an operator, typical requirement is PL d or PL e for the stop function and guard interlocks. For a case sealer with a guarded tape head, PL c is often the typical requirement. The standard also requires documentation of the architecture: category (B, 1, 2, 3, 4), the mean time to dangerous failure, the diagnostic coverage, and the test interval. When you review a supplier’s file, ask for the PL table. If they cannot produce it, they are not doing the ISO 13849-1 work, and your machine’s safety case is thinner than it should be.

Cybersecurity for compliance-relevant control systems

We want to spend a paragraph on this because it is the part of the new regulation most buyers are not prepared to ask about. Your machine is a networked computer. It has a PLC, an HMI, often a remote-access VPN, and sometimes a cloud diagnostics portal. Under the new regulation, the manufacturer must address cybersecurity threats that could affect safety.

What should you ask? A short list: Which network ports are open by default? Is the safety controller isolated from the general-purpose network, or on the same VLAN? Are firmware updates signed? Can a logged-in user change a safety parameter, and if so, how is that role-controlled and logged? What is the supplier’s process for notifying customers of a security vulnerability that affects safety functions? How are default credentials handled at installation? These are not IT questions for your CIO; they are safety questions for your site engineer, and the new regulation makes them part of the conformity file.

We see this play out on connected lines where the maintenance team uses a third-party remote-access tool that was never part of the supplier’s approved architecture. That is the kind of thing a market-surveillance inspector will flag. If you are integrating your end-of-line cell into a broader OPC UA / WMS / MES environment, ask your controls engineer to map the network zone from the safety controller outward, and make sure the supplier’s cyber-safety documentation matches that map.

The paperwork you should now ask your supplier for

When you issue an RFP or purchase order for end-of-line machinery, build these items into the contract. They are the same items under the old directive, but the new regulation raises the bar on what “good” looks like.

  • A signed Declaration of Conformity referencing Regulation (EU) 2023/1230 (for machines placed on the market from 20 January 2027 onward), with the machine’s serial number and the notified body number where applicable.
  • The technical file: design calculations, circuit diagrams, pneumatic and hydraulic schematics, software descriptions, and the list of harmonized standards applied.
  • The ISO 12100 risk assessment, per hazard, with residual risk statements.
  • The ISO 13849-1 performance-level table for each safety function: emergency stop, guard interlock, light curtain, muting, safe speed, two-hand control.
  • The instructions for use in the language(s) of the member state where the machine will operate, delivered as a searchable digital package with a stated long-term availability.
  • The cyber-safety documentation: network architecture, open ports, firmware update process, vulnerability notification policy.
  • The CE marking process confirmation — whether the machine was self-certified under internal control or went through a notified body, and if the latter, which body and what certificate number.

If a supplier pushes back on any of these, treat that as data. A builder who has been doing this for ten years will have most of this on a shared drive. A builder who cannot produce a PL table on request is telling you something about their engineering maturity, and you should weight that in your supplier selection, not just the price.

Second-hand machines and grey imports

Two scenarios catch buyers. First, a used palletizer or stretch wrapper bought from a European dealer. If the machine was placed on the market before 20 January 2027, it can continue to be sold and used under the old directive. But the used-equipment dealer becomes the “manufacturer” in regulatory terms if they substantially modify the machine — adding a new robot, changing the safety logic, relocating the control cabinet. A used cell that is rebuilt in 2027 may need a fresh DoC under the new regulation. Ask the dealer: are you reselling as-is, or are you remanufacturing? The answer changes the paperwork.

Second, a machine sourced directly from outside the EU — for example, a Chinese-built strapping machine or cartoner bought without a European importer on the paperwork. Under the new regulation, you, as the person who brings the machine into the EU, take on importer obligations. That means verifying the DoC, holding the technical file, ensuring language instructions, and accepting market-surveillance liability. We see small plant engineers occasionally assume that “CE on the nameplate” is enough; it is not. If there is no EU importer of record on the DoC, you are it.

Old directive vs new regulation: what changes

The table below summarizes the six dimensions buyers most often ask about. Use it as a quick reference in supplier discussions.

Table 1 — Directive 2006/42/EC vs Regulation (EU) 2023/1230: what changes for end-of-line buyers
Dimension Old: Directive 2006/42/EC New: Regulation (EU) 2023/1230 What it means for your buying decision
Legal form Directive, transposed into national law per member state; some interpretation drift between countries. Regulation, directly applicable in every member state from 20 Jan 2027; uniform text. Less room for a supplier to say “in Germany we do it this way.” Ask which text the DoC references.
Safety software (including AI) Safety functions covered generally; AI in safety loops not specifically addressed. Suppliers often described vision/ML features as productivity. Integrated provisions for machinery with AI-powered safety functions; those functions must be assessed and documented as safety functions. If a safety loop uses vision or learned models, demand the validation data and PL claim. Do not let marketing language blur safety vs productivity.
Cybersecurity Not a specific requirement; remote access and open ports treated as customer IT concern. Cyber-safety required for compliance-relevant software, data and control systems. Ask for network architecture, open ports, signed firmware, and vulnerability-notification process. Especially on networked palletizers and wrappers.
Digital documentation Instructions expected in paper form; electronic delivery left to national interpretation. Digital instructions and digital Declaration of Conformity explicitly allowed, including machine-readable formats. You can contract for searchable digital manuals. Specify long-term document hosting (typical: machine lifetime).
Conformity assessment for higher-risk machines Annex IV list of specific machine categories requiring notified-body involvement; custom integrated systems sometimes ambiguous. Adds an “individual test” route for higher-risk machinery assessed unit by unit by a notified body. For one-off integrated cells, ask whether the supplier will use the individual-test route and factor the 4–8 week lead time into your schedule.
Importers and distributors Obligations existed but were lightly enforced; small importers often relied on manufacturer paperwork. Sharper verification duties: confirm DoC, hold technical file, language instructions, forward complaints. If you source from outside the EU without an importer of record, you are the importer. Ask for the importer’s name on the DoC.

What this means for your buying decision

When you sit down to evaluate a supplier for an end-of-line machine in late 2026, run these checks. They are written as actions, not theory.

  1. Ask which regulation the DoC will reference. For a machine placed on the market on or after 20 January 2027, it must be Regulation (EU) 2023/1230. A supplier still certifying to 2006/42/EC for a 2027 delivery is either behind schedule or taking a calculated risk — either way, your problem. Get it in the contract.
  2. Request the ISO 13849-1 performance-level table before you place the order. Not after FAT. Before. You are looking for a per-safety-function table with PL rating, category, and test interval. If the supplier cannot produce it, the safety case is thinner than the price suggests.
  3. Treat “smart” safety features as a documentation line item. Vision-based guarding, adaptive speed, AI product detection — ask whether each is a safety function or a productivity feature, and demand the supplier’s written position. If it is a safety function, it needs the validation evidence; if it is productivity, it should not be sold to you as a safety upgrade.
  4. Map the network and ask for the cyber-safety file. Which ports are open, how is the safety controller segmented, how are firmware updates signed, how are safety-parameter changes role-controlled and logged? For any networked palletizer, wrapper or cartoner, this is now part of the conformity file, not an IT add-on.
  5. Confirm the importer of record on the DoC. If you are buying from a non-EU builder, there must be an EU importer accepting the regulatory role. If there is not, you are it, and you need to budget for that work — holding the technical file, providing language instructions, responding to market-surveillance requests.
  6. For custom integrated cells, ask about the individual-test route and the lead time. A one-off palletizer + wrapper + strapping + conveyor system may need a notified body assessment. Factor the added weeks into your cutover plan, not after the contract is signed.

On top of those six, two softer checks. First, ask the supplier for a sample of a recent DoC and risk-assessment package (redacted for another customer) so you can see the format they actually deliver, not the format they promise. Second, ask how long they will host the digital instructions and technical file after acquisition — typical expectation is the machine’s working life, and the answer tells you something about their long-term support.

How this connects to vision, AI and connected lines

The regulatory shift toward AI safety functions and cyber-safety lines up with where end-of-line equipment is heading anyway. Machines are getting more connected, more sensor-rich, and more capable of adapting to mixed SKUs. We wrote separately about machine vision and AI at the end of line, and the compliance point there is the same: vision and AI are powerful productivity tools, but when they touch a safety function, the documentation bar rises. Do not let a supplier merge the two stories in your proposal — productivity vision and safety vision are different engineering problems with different evidence requirements.

Likewise, the connected-line trend toward OPC UA and MES integration is where cyber-safety lives. The same network that carries your OEE data to the dashboard is the network that a regulator will inspect when they ask how a firmware update is signed. Build these two conversations together: ask the IT network question at the same time as the safety question, because they share the same cable.

Common questions from buyers

Does a machine I bought in 2025 need recertification in 2027?

No. Machinery placed on the EU market before 20 January 2027 remains under the old Directive 2006/42/EC. You do not need to bring it into conformity with the new regulation on that date. What does trigger a fresh assessment is a substantial modification — adding a new safety controller, integrating a new robot, changing the safety logic. If you are retrofitting a 2025 palletizer in 2028, talk to a compliance engineer about whether the modification crosses the threshold into “placing on the market” again.

Can a supplier keep shipping old-directive machines after 20 January 2027?

Only for machines that were already placed on the market before that date — for example, stock sitting in a European warehouse. A new machine manufactured and shipped after 20 January 2027 must be certified under Regulation (EU) 2023/1230. There is no general extension for inventory built under the old directive that has not yet been placed on the market.

What happens if I buy a machine with a DoC that references the old directive after the deadline?

It is not legally placed on the market in conformity with the applicable rule. Market-surveillance authorities can order the machine removed from service, and you as the end user face the disruption. In practice, the importer or distributor is the first point of enforcement, but the operational impact lands on your plant. This is why we ask for the DoC reference in the contract before you sign, not after delivery.

Do I need ISO 12100 and ISO 13849-1 certificates myself, as the buyer?

No. Those are the manufacturer’s standards for demonstrating conformity. As the buyer, you do not get a personal ISO 12100 certificate. You ask the manufacturer to show you the risk assessment and the PL table as part of the technical file. If you integrate machines from multiple suppliers into one cell, the integrator (could be you) takes on responsibility for the integrated safety case — that is where your own ISO 13849-1 work, or a third-party assessor, comes in.

How much extra cost should I expect from the new regulation?

For a standard off-the-shelf machine (a basic case sealer, a standard inline strapper, a generic stretch wrapper), the cost increase is modest: most of the documentation updates are absorbed by the supplier’s engineering team. For custom integrated cells, the individual-test route and the cyber-safety documentation add real engineering hours and notified-body fees. Typical impact we see on a one-off integrated cell is a modest percentage uplift and several weeks of schedule, but the exact number depends on the supplier’s existing documentation maturity — a builder who was already doing ISO 13849-1 properly absorbs the change almost for free; a builder who was cutting corners has to catch up.

The bottom line

The EU Machinery Regulation 2023/1230 is not a bolt-on compliance project. It is a baseline shift in how end-of-line machines are documented, networked, and brought to the European market. For a buyer in late 2026, the moves are practical: ask which rule set the DoC references, demand the PL table, treat “smart” safety features as a documentation line item, map the network, confirm the importer of record, and factor the individual-test lead time into your cutover plan. None of those asks is exotic. They are the same things a careful buyer should have been asking all along, but the new regulation makes them enforceable instead of optional.

If you are planning a 2027 line, start the compliance conversation with your supplier this quarter. The fourteen-month runway is shorter than it looks when you account for FAT, shipping, installation and commissioning, and the last thing you want is a line that meets production goals but fails a market-surveillance visit because the paperwork was drawn up against the wrong rule.

References: Regulation (EU) 2023/1230 on EUR-Lex; European Commission — Machinery sector; ISO 12100 Safety of machinery — General principles for design; ISO 13849-1 Safety-related parts of control systems; OSHA (US reference).

Grace Wu
Grace Wu Quality & Compliance Engineer — Standards & Testing
10+ years in machinery quality control, testing and documentation

Grace runs pre-shipment quality reviews and performance testing for packaging machines: dimension and weld checks, cycle-time trials, seal and wrap quality tests, safety and documentation review, and the FAT record that travels with the equipment. Her articles explain testing standards, acceptance criteria and what certification paperwork buyers should request for export machinery.

Quality Assurance CE Compliance Performance Testing