Help & After-Sales Center
From installation and operator training to spare parts, remote diagnostics and scheduled maintenance, SunAura Packaging Machines engineers support your equipment across its entire lifecycle — anywhere in the world.
How Can We Help You Today?
Jump straight to the resource you need — most issues can be resolved in minutes with the right guidance.
Troubleshooting
Fault codes, symptoms and step-by-step fixes.
Spare Parts
Genuine wear parts and recommended spares.
Manuals & Docs
Operation manuals, drawings and certificates.
Installation
Site checklist and commissioning guide.
Operator Training
Agendas, videos and multilingual materials.
Warranty
Coverage, terms and how to make a claim.
Maintenance Plan
Daily, weekly, monthly and annual tasks.
Remote Support
Video, AR and PLC remote diagnostics.
Your After-Sales Journey
A clear, seven-stage process that begins before your machine leaves our workshop.
- 1
Pre-Delivery Inspection
Every machine undergoes a Factory Acceptance Test with your film and products where samples are provided.
- 2
Delivery & Unpacking
We confirm packing, documents and spare parts, and guide the on-arrival inspection.
- 3
Installation & Commissioning
Positioning, utility connection, parameter setup and a verified production trial.
- 4
Operator Training
Hands-on training for operation, changeover, daily checks and first-line fault handling.
- 5
Remote Support
Fast diagnosis by video call, AR guidance or secure PLC remote access.
- 6
Preventive Maintenance
Scheduled servicing protects uptime and extends equipment life.
- 7
Overhaul & Upgrade
Retrofits, capacity expansion and major overhaul keep the line competitive.
Limited Warranty & Coverage
SunAura Packaging Machines machinery is built for continuous industrial duty and backed by a standard limited warranty, with extended cover available at order.
What is covered
- Defects in materials and workmanship under normal use
- Mechanical and electrical components that fail within the warranty period
- Repair or replacement of confirmed defective parts
- Remote troubleshooting and commissioning defects
- Software/parameter restoration for the supplied configuration
What is not covered
- Consumables and normal wear parts (heaters, blades, belts, Teflon, cutting wire)
- Misuse, abuse, neglect or failure to follow the maintenance schedule
- Unauthorized modification or repair by third parties
- External causes: power surges, water ingress, corrosion, unsuitable environment
- Issues caused by film, materials or product quality
- Freight, travel and labour for non-warranty calls
Standard period
12 months from commissioning or 13 months from the bill of lading, whichever comes first. An extended warranty (24/36 months) can be added before shipment.
How to make a claim
Keep the machine model and serial number ready, record a short video and photos of the fault, then submit a support ticket. We diagnose remotely first and ship parts or arrange service as required.
Prepare Your Site for a Smooth Start
Most commissioning delays trace back to site readiness. Confirm the items below before the machine or engineer arrives.
Pre-installation checklist
- Level floor / foundation with the load capacity shown on the layout
- Clear space for operation, changeover and maintenance access
- Power supply (voltage / phase / Hz) with a dedicated breaker and reliable grounding
- Clean, dry compressed air at the required pressure and flow
- Suitable ambient temperature and humidity; no corrosive or explosive atmosphere
- Infeed, conveyors and downstream equipment positioned and tested
- Film, cartons and products on site for the production trial
- Operators and maintenance staff scheduled for training
What commissioning includes
- Unloading, positioning and levelling the machine
- Connection of power, air and signal interfaces
- HMI and servo parameter configuration for your format
- Film / carton loading and format changeover setup
- Production trial with speed and seal-quality verification
- Safety-function check and Site Acceptance Test (SAT)
- Handover of manuals, spare parts and maintenance schedule
A remote-guided, video-supported installation is available for standard machines when on-site travel is impractical.
Operator & Maintenance Training
Well-trained teams run faster, change over quicker and prevent the majority of avoidable stoppages.
| Session | Topics covered | Recommended attendees |
|---|---|---|
| Machine & safety overview | Construction, safety guards, interlocks, lock-out / tag-out | All staff |
| Control system & HMI | Recipes, parameters, alarms, data backup | Operators, maintenance |
| Standard operation | Start-up, normal running, shutdown, quality checks | Operators |
| Format / film changeover | Film loading, pitch, forming box, quick-change parts | Operators |
| Daily maintenance | Cleaning, lubrication, inspection, sensor care | Operators, maintenance |
| Fault recognition & reset | Common alarms, first-line troubleshooting | Maintenance |
| Spare parts management | Wear-part identification and stock levels | Maintenance, stores |
Flexible formats
On-site hands-on training, recorded video tutorials and printed manuals in multiple languages. We can also run a train-the-trainer programme for larger teams.
Training outcome
Your operators independently run the line, complete changeovers, perform daily checks and resolve first-line faults with confidence.
A Maintenance Schedule for Every Shift
Disciplined, interval-based maintenance is the single biggest factor in machine availability and service life.
| Interval | Maintenance tasks |
|---|---|
| Daily | Clean the machine and film path; check air pressure; wipe the photocell and sensors; verify seal temperature; test emergency stops; remove product debris. |
| Weekly | Inspect sealing jaws and cutter; check belt and chain tension; lubricate per the lubrication chart; inspect guards and guides. |
| Monthly | Inspect electrical terminals; check wear of consumables; verify temperature calibration; clean filters and cooling; back up HMI parameters. |
| Quarterly | Inspect bearings and gearboxes; check servos and encoders; test all safety functions; replace air filters. |
| Annual | Full mechanical and electrical inspection; gearbox oil change; replace worn parts; recalibrate controls; review software and torque settings. |
Use the specified lubricants — food-grade grease on food-contact or bakery lines — and keep the recommended wear parts in stock. Download the printable schedule from the download center, or read our preventive maintenance knowledge articles.
Symptoms, Causes & Recommended Actions
Filter by machine family or use the search box at the top. Click any symptom to expand the likely cause and corrective action.
You can also browse the equipment families directly: flow wrappers, case sealers, case erectors, shrink wrappers, pallet wrappers and strapping machines.
Likely cause: seal temperature too low, speed too high, insufficient roller pressure or incorrect / damp film.
Action: Raise the temperature in small steps, confirm film suitability, check fin-seal roller pressure and alignment, and reduce speed for a seal-quality test.
Likely cause: crimp jaws misaligned, uneven temperature, excessive film tension or worn jaw serrations.
Action: Re-align and re-time the crimp jaws, balance left/right temperature and reduce film tension at the forming box.
Likely cause: photocell sensitivity or mode incorrect, dirty lens, guide rollers mis-set or printed mark contrast low.
Action: Clean the photocell lens, re-center the film at the forming box, then recalibrate the eye-mark sensor in the correct (light/dark) mode.
Likely cause: product pitch does not match film feed, infeed timing is off or products are too close.
Action: Adjust bag length / pitch and infeed timing, verify product spacing and check the push-lug timing on the infeed conveyor.
Likely cause: dull cutting blade, incorrect blade-to-anvil gap or cutting timing offset.
Action: Replace or sharpen the blade, reset the blade gap to the manual value and re-check cut timing.
Likely cause: failed heater, thermocouple or solid-state relay (SSR); loose connection.
Action: Check the heater resistance and thermocouple reading, inspect the SSR and fuses, and replace the failed component.
Likely cause: worn or gummed tape-cutting blade.
Action: Clean or replace the tape blade and confirm the tape is routed correctly through the blade assembly.
Likely cause: tape tension too high or low, or boxes entering off-center.
Action: Adjust tape tension, center the side guides to the carton and confirm flaps are fully folded before taping.
Likely cause: flaps not folded, size outside range or guides set too tight.
Action: Ensure leading/trailing flaps are tucked, reset width and height guides to the carton, and remove any damaged box.
Likely cause: worn suction cups, low vacuum, incorrectly stacked blanks or warped cartons.
Action: Inspect/replace suction cups, check the vacuum pump and filters, and square the blank magazine within specification.
Likely cause: flap-tucker timing, tape/glue timing or guide alignment out of set.
Action: Re-adjust forming-guide position and tucker/tape timing, and verify flat-blank dimensions against the set recipe.
Likely cause: tunnel temperature too low, dwell too short, insufficient airflow or oversized film.
Action: Increase temperature or reduce conveyor speed, adjust the air-flow directors and confirm film gauge and bag slack.
Likely cause: temperature too high, dwell too long or hot air concentrated on one point.
Action: Lower temperature, increase belt speed and re-direct airflow; confirm the film temperature rating.
Likely cause: insufficient perforation, poor air circulation or excess film.
Action: Add/improve perforations, adjust corner airflow and reduce excess film in the seal.
Likely cause: worn seal wire, damaged Teflon cover or degraded insulation.
Action: Replace the seal wire and Teflon cover, check electrical connections and confirm arm pressure.
Likely cause: tension too high, sharp load corners or poor-quality film.
Action: Reduce film tension / pre-stretch, add corner protectors and verify film grade for the pre-stretch ratio.
Likely cause: film clamp/cut unit timing or tail length incorrect.
Action: Adjust tail length and clamp/cut timing, clean the cutting blade and check the wipe-down brush.
Likely cause: insufficient top/bottom wraps, roped film or wrong overlap pattern.
Action: Increase wrap counts, set an even film band (avoid roping) and add a bonded top-sheet pattern where needed.
Likely cause: temperature/speed mismatch, low pressure or misaligned PTFE bands.
Action: Adjust temperature versus conveyor speed, check band tracking and pressure rollers, and confirm bag material.
Likely cause: worn, frayed or mis-tracked Teflon belt.
Action: Re-track or replace the PTFE belt, check roller alignment and confirm no residue is building on the band.
Likely cause: low pump oil, worn seals/gaskets, chamber leak or low gas supply.
Action: Check pump oil level and seals, inspect the chamber gasket and lid closure, verify gas pressure and mixing settings, and confirm sealing time.
Likely cause: feeder empty/mis-set, detection sensor fault or product/leaflet out of specification.
Action: Refill and re-set the feeders, clean/check the detection sensors and verify leaflet/product dimensions.
Likely cause: glue temperature low, bead position/size wrong or compression time short.
Action: Confirm glue temperature and bead pattern, check nozzle condition and increase compression / dwell time.
Likely cause: warped blanks, out-of-spec cartons or tucker/forming timing offset.
Action: Check flat-blank quality and dimensions, re-adjust forming-pocket and tucker timing and confirm the push-bar timing.
No fault entries match your search. Try different keywords or ask an engineer.
Genuine Parts Protect Uptime
Genuine SunAura Packaging Machines wear parts are matched to your machine’s duty cycle and tolerances — non-genuine parts are a common cause of seal defects and secondary damage.
| Machine family | Recommended spare / wear parts |
|---|---|
| Flow wrappers | Heaters, thermocouples, SSRs, sealing-jaw inserts, cutting blade, Teflon tape, timing belts, eye-mark photocell, fuses |
| Case sealers | Tape-cutting blade, tape rollers, drive belts, guide bristles, springs |
| Case erectors | Suction cups, tape blades / glue heads, vacuum filters, seals, sensors |
| Shrink / L-bar | Seal wire, Teflon cover & tape, insulation strip, heaters, blower filters |
| Pallet wrappers | Pre-stretch rollers, film clamp/cut unit, drive belts, brushes |
| Band sealers / vacuum | PTFE bands, heaters, ink wheels, gaskets, pump oil & filters |
| Common electrical | Fuses, relays, contactors, proximity sensors, air filters, specified lubricants |
How to order
Quote the machine model and serial number and the part number from the manual (a photo of the nameplate helps). We confirm stock, price and freight; common wear parts ship quickly, while made-to-order items have a confirmed lead time.
Where to find the serial number
The identification plate is fixed to the machine frame / electrical cabinet and lists the model, serial number, voltage and date. Include it with every parts request to avoid mismatches.
Fast Diagnosis, On-Site When Needed
Remote technical support
- Photo and short-video fault review by an application engineer
- Live video call and AR-guided repair on the machine
- Secure PLC / HMI remote access where connectivity allows
- Parameter and recipe restoration from the supplied backup
- Expedited genuine-parts dispatch
On-site service
- Commissioning and Site Acceptance Test
- Operator and maintenance training
- Major repair, overhaul and line audits
- Integration with existing equipment
- Engineer dispatch with visa and travel handled by our team
| Severity | Definition | Target response |
|---|---|---|
| S1 — Critical | Line down or safety-related stoppage | Within 8 working hours; remote support same day |
| S2 — Major | Reduced speed or intermittent fault | Within 24 working hours |
| S3 — Minor | Cosmetic, documentation or non-urgent request | Within 2 business days |
Response targets are measured across working hours and time zones; customers with an extended warranty receive priority scheduling.
Documentation, Videos & Knowledge
Everything required to operate, maintain and understand your SunAura Packaging Machines equipment.
Operation & Maintenance Manuals
Machine-specific manuals, parts books and wiring diagrams.
Datasheets & Drawings
Dimensions, utility requirements and layout drawings.
Certificates
CE and compliance documentation for qualification files.
Video Tutorials
Real machine operation, changeover and line videos.
Technical Knowledge
Buying guides, maintenance articles and ROI analysis.
Product Catalog
The full packaging machinery range and options.
Transit Damage, DOA & Returns
On-arrival inspection
Inspect goods immediately on delivery and note any visible packaging damage on the carrier’s proof of delivery. Concealed damage should be reported within 7 days of receipt.
Damage or DOA claim
Send photos of the outer packaging, packing and the item, plus the packing list. Confirmed damage or dead-on-arrival items are replaced and the freight claim handled with our support.
Wrong item
Notify us within 7 days with the packing list and photos; we arrange the correct item and recovery of the original.
Non-warranty returns
Returns require prior authorization, an RMA number and the item in new, complete condition. Restocking and freight terms are confirmed in writing before return.
Extend Capacity Without Replacing the Line
Many machines can be modernized in place to raise speed, add automation or meet new standards.
Servo & control upgrades
Convert mechanical drives to servo, modernize HMI and restore parameter control.
Automatic feeding
Add auto infeed, feeders, magazine loaders and material-handling modules.
Speed & format expansion
Increase throughput or extend the range of sizes and products handled.
Safety & compliance
Guarding, interlock and CE-aligned safety upgrades on older equipment.
Connectivity
Data output, OEE monitoring and line-integration interfaces.
Audit & trade-in
On-site assessment, retrofit proposal and trade-in options.
Explore turnkey line capabilities or request a retrofit assessment.
Open a Support Ticket
Tickets are logged and tracked by our after-sales team, with response according to the severity you select.
