TL;DR. This article reads the 2026 market signals around end-of-line equipment lead times sourcing for case sealers, stretch wrappers, strappers, palletizers and shrink wrappers, and compares the supply routes buyers actually choose between: new machines, used or refurbished units, regional suppliers, and suppliers shipping from China. It breaks the demand and capacity drivers down, lays out typical lead-time bands, pricing conditions, spare-parts availability, deposit and payment milestones, FAT and SAT implications, warranty and parts continuity on used units, and how tariffs and trade duties move landed cost. The figures below are planning ranges drawn from real quotations and floor observations, not guaranteed specs; supplier numbers depend on configuration, site scope and shipment terms. The article stays on end-of-line wrapping, sealing, strapping, palletizing and shrink wrapping. Upstream product-handling processes and complete integrated-line scope sit outside this piece.
By Sarah Liu, Procurement Engineer — Equipment Sourcing. Sarah evaluates supplier quotes, lead times, warranty and spare-parts continuity for end-of-line machinery across new, refurbished and regional supply options.
The 2026 end-of-line equipment lead times sourcing backdrop
When a plant manager raises the question of buying a new case sealer, stretch wrapper, strapper, palletizer or shrink wrapper in 2026, the first useful check is not which model to pick, but where the supply cycle stands. Order-book density, shop utilization, component availability and trade policy together set how fast a supplier holds a quote, how quickly used machines disappear from the resale pool, how far spare-parts stocks stretch, and how firmly pricing holds between the purchase order and delivery. Reading that backdrop first keeps the buying decision grounded in real conditions rather than in a vendor’s brochure timeline.
The broad packaging equipment outlook, as framed by public market research from PMMI and Freedonia, points to steady investment in packaging machinery rather than a sharp boom or a downturn. End-of-line equipment sits in the part of that investment pool that closes the plant: cartons sealed, loads wrapped, bundles strapped, pallets built, and loads stabilized for warehouse and freight. Statista context on industrial equipment and prices, and OECD material on trade, tariffs and manufacturing conditions, give the wider economic frame: capital spending moves with output growth, labor pressure and cross-border trade rules, and those conditions vary by region. We treat these top-line signals as directional background, not as a substitute for checking your own line, your own product range and your own delivery deadline.
The Interpack trade fair cycle and the broader packaging show calendar shape the same backdrop: suppliers bring refreshed machine ranges, control platforms and wrapping innovations to market, and buyers use those events to compare formats, see running machines and collect quotes. The fair context helps explain why mid-year and show-season ordering often competes for the same fabrication slots. None of this means a buyer should time a purchase around a trade event; it means quotes, delivery slots and component reservations tighten in periods when the market is busy, and loosen when demand eases.
One caution on market-size and growth numbers. Published estimates for packaging machinery vary by research firm, depending on which machine categories, regions and currency basis are counted. In this article we do not anchor a purchasing decision to one precise segment figure. The safer read is the directional one: demand for equipment that stabilizes, secures and moves packed goods keeps running, and the shops building those machines stay occupied enough that lead times, quote validity and parts support remain the variables buyers plan around. The public sources listed at the end of this piece are the place to cross-check the wider context, read each one with its own methodology in mind rather than blending the percentages.
What drives 2026 supply conditions
Headline demand growth is easy to skim past. The useful part for a buyer is understanding why order books look the way they do, because each driver changes how long a machine waits to be built, what a quote holds, and which supply route gets the job done. We group the pressure points seen on the floor into four buckets: order books and shop capacity, component and material supply, labor and skills at fabrication and integration partners, and trade policy, tariffs and duty exposure.
Order books and shop capacity
Capacity utilization is the variable behind every quoted delivery date. When fabrication shops, control-panel builders, robot integrators and wrapping-cell partners work near full load, the open slots go first to orders that are ready to release: settled carton and load data, confirmed product samples, a cleared layout, agreed guarding and safety scope, and cleared compliance questions. A buyer who arrives late with an incomplete spec waits behind those ready orders, even when the machine on paper is a standard model. We see this on the floor when two identical semi-automatic sealers are quoted to two plants at the same time; one order releases within a week and holds the near slot, the other drifts because carton samples and site layout arrive late, and the delivery date moves by weeks as the queue fills.
In a busy cycle, suppliers also sequence their own shop work by machine type. High-rate palletizer cells, robotic stations and integrated wrapping lines consume engineering and floor space first; simple standalone sealers and strappers move faster through the same shop. A buyer who needs a robot palletizer in a fixed commissioning window should expect that engineering queue to be the binding constraint, not the robot brand name. The practical move is to do the application homework early, so that when a delivery slot opens the purchase order can hold it without a last-minute scope scramble.
Components, steel and wrapping consumables supply
End-of-line machines draw on a shared pool of standard industrial inputs: carbon and stainless steel, conveyor frames, bearings, gears, motors, drives, PLCs, HMI panels, sensors, safety fencing, robot arms and grippers, wrapping film and strapping material. Where any of those inputs sits on long lead supply, the machine waits on that component first, regardless of how fast the weld shop runs. In recent cycles, control platforms, servo drives and robot manipulators have been the items most often flagged as back-ordered; structural steel and conveyor fabric tend to move faster once the shop has space.
Consumables sit on a different cycle from the machine itself. Stretch film, strapping (PP and PET), carton tape and shrink film keep flowing after handover, and their price and availability affect the running cost of the station for years. A buyer comparing two quotes should not stop at the machine price: the wrapper that pulls heavier film, or the strapper that feeds a strap width no local supplier stocks, creates a consumables dependency that shows up on the monthly invoice. Our read on this is to list the consumables and wear parts a machine will actually consume, confirm local or regional supply of each, and price that recurring cost into the total budget.
Labor and skills at fabrication and integration partners
Equipment supply depends on people as much as on steel and components. Shops need welders, panel builders, electricians, mechanical fitters, commissioning engineers and application engineers. Where those roles are tight, a supplier with a full order book may allocate skilled commissioning time to the projects furthest along, and a standalone machine that built quickly can wait for an engineer to travel and start it on site. Integration-heavy jobs, especially palletizer cells with fencing, safety circuits, conveyor ties and MES or WMS handshakes, need more skilled hours than a simple wrapper or sealer.
We see this show up in quotations as install and commissioning scope: some prices include on-site travel, a fixed number of commissioning days and operator training; others list those items separately, and a buyer who assumed inclusion finds them added at delivery. The skill gap also explains why used-machine rebuilds depend heavily on the rebuilder’s own bench staff, not only on the age of the machine. A refurbished unit rebuilt by a supplier with active workshop capacity can move faster and hold condition better than one parked in a yard waiting on service attention.
Trade policy, tariffs and duty exposure
Cross-border supply sits under trade rules that change year to year. OECD context on trade and manufacturing tracks how duty schedules, trade remedies, customs procedures and origin rules move between importing and exporting economies. For an equipment buyer, the practical effect is that the same machine quoted from two different regions can carry a different landed cost once duties, clearance handling, freight insurance and inland delivery are added on top. Tariff exposure also shifts when the rule book distinguishes between a finished machine, a partially assembled cell, and imported components assembled locally.
Trade policy uncertainty tends to compress quote validity in importing markets: a supplier quoting a machine that crosses a border may hold prices for a shorter window, or build a duty and freight contingency into the price, because the duty number itself can move between quote and order. Buyers exporting their finished goods should also remember that destination-market electrical ratings, guarding norms and documentation language travel with the machine, and those compliance items can add scope that a domestic supplier would handle more easily. Duty bands and freight terms layer onto the base machine price, and that layer deserves its own line in the cost comparison rather than being buried in the headline number.
New versus used and refurbished supply conditions
The first sourcing split most buyers face is between ordering a new machine, buying a used unit as-is, or taking a refurbished machine rebuilt by a supplier. Each route carries a different lead time, price, warranty posture and parts-support profile. The right choice depends on the station’s role in the line, the rate it must hold, the SKU mix it will face, and how long the plant expects to run that format.
New equipment supply
A new machine comes with the current design, current control platform, current guarding and safety documentation, a fresh warranty from the builder, and parts that sit in the builder’s active catalog. The trade-off is lead time: new builds move through fabrication, panel build, factory test and shipping, and any custom format, unusual load dimension or integration scope stretches that schedule. New machines suit stations that anchor a high-volume line, that must match current compliance expectations, or that need a documented warranty and an active parts channel for the years ahead.
New supply conditions in 2026 favor buyers who have their application data ready early. A standard automatic case sealer for regular RSC cartons, a standard turntable stretch wrapper for regular pallets, or an inline strapper for a fixed strap pattern can usually be quoted and built on a shorter schedule than a robotic palletizer cell with custom gripper, fencing and conveyor ties. When the shop runs busy, the ready spec gets the near slot; the late spec waits. Our packaging machine lead-time breakdown lists the schedule stages buyers should ask suppliers to separate out, so the quoted date does not hide where delay risk concentrates.
Used and refurbished units
Used and refurbished machines enter the conversation for three reasons: lower entry price, shorter apparent availability, and a unit that already ran a similar product. The resale pool pulls from lines that closed, formats that changed, and plants that upgraded. A used sealer, wrapper or strapper can make sense for a second shift, a temporary peak, a low-priority line, or a budget-constrained startup that will revisit automation once volume grows. The risks matter just as much: unknown wear on bearings, gearboxes, seal heads, wrap carriages and strap channels; degraded guarding; outdated control platforms; missing manuals and build documentation; and components that the original builder no longer supports.
A refurbished unit sits between as-is used and new. A credible rebuild covers inspection, wear-part replacement, cleanup, repainting, control check, a test run under observed conditions, and often a limited warranty from the rebuilder. The rebuild depth varies widely between sellers, so the inspection list and the warranty terms decide what you actually bought. Buyers should also check replacement parts for the candidate model remain available before committing; a machine whose seal head or wrap carriage is no longer stocked can turn a low purchase price into a long downtime event. The used, refurbished and new equipment comparison for 2026 covers warranty, lead time and risk trade-offs in more detail.
Warranty, parts continuity and documentation when going used
Warranty posture is where new and used supply differ most sharply. A new machine typically carries a builder warranty covering parts and labor for a fixed period after commissioning, with stated exclusions for consumables and misuse. A used machine bought as-is usually carries no warranty at all; responsibility for wear failure after handover sits with the buyer. A refurbished machine may carry a limited rebuilder warranty covering the rebuild work, often shorter in duration and narrower in scope than a new-unit warranty, and consumables still fall outside cover.
Parts continuity deserves the same scrutiny. Before ordering any used unit, identify the wear parts and service components that station consumes: belts, blades, heating elements, seal jaws, strap feed wheels, wrap film carriage parts, gearbox oil, bearings, sensors and control boards. Check whether those parts are still stocked by the builder, by a parts distributor, or by the rebuilder, and how long a replacement would take to reach you. Documentation matters too: manuals, electrical schematics, PLC programs, guarding drawings and compliance certificates make troubleshooting faster and make any later audit or safety review defensible. A used machine without paperwork can still work, but the buyer is accepting that knowledge gap as part of the purchase decision.
Regional versus China-based supply
The second sourcing split is geography: suppliers fabricating or assembling in the buyer’s own region, versus suppliers shipping from China. Neither route wins on every dimension. The comparison should run on total landed cost, delivery schedule, communication and service access, parts support after handover, and compliance documentation for the destination market.
Regional suppliers
Regional builders and integrators, operating in or near the buyer’s market, tend to quote shorter freight legs, easier on-site commissioning, closer access to spare parts and service technicians, and documentation aligned to local electrical and safety expectations. They can also visit the site for measurement, layout review and follow-up troubleshooting without a long travel cycle. The usual trade-off is purchase price: regional labor and local steel pricing put a higher base machine price on the quote, and a smaller builder may have a narrower range of formats or control platforms than a large international OEM.
Regional supply fits projects where commissioning must land on a fixed date, where on-site support after start-up matters, where compliance documentation for the destination market is demanding, or where the buyer wants a single accountable party for machine, install and training. For palletizer cells and integrated wrapping stations, the service access argument often carries more weight than the base price difference, because those stations need commissioning attention and later spare-parts response more than a standalone sealer does.
China-based suppliers
China-based equipment builders supply a wide range of end-of-line formats, from standalone sealers and strappers to turntable and rotary-arm wrappers, robotic palletizers and shrink tunnels. Their base machine price often competes strongly against regional quotes, especially for standard configurations, and many builders export regularly and prepare English documentation and export packing. The buying decision should not stop at the base price, though: freight, insurance, customs clearance, duties, inland delivery, import agent fees, overseas commissioning travel, currency exposure and communication time zones all layer onto the machine cost.
The practical risks on imported supply are schedule and service. Lead time runs through build, ocean or air freight, customs clearance and inland transport, and overseas commissioning engineers are booked on a travel schedule. Spare parts after handover usually arrive by freight rather than from a local shelf, so a critical wear part can take days or weeks to replace. Buyers choosing this route should verify the supplier’s export references for their own market, ask for factory inspection (FAT) video or visit, agree who handles on-site SAT and training, and size a starter spare-parts kit to cover the first operating period. Our regional, China and used supply sourcing guide sets out the landed-cost and service comparison line by line.
Landed cost, duties and freight in the sourcing decision
Landed cost, not sticker price, is the number to compare between supply regions. Work through the machine base price, packaging for export, freight to the destination port or site, marine or cargo insurance, import duties calculated on the applicable tariff line, customs clearance and broker fees, inland transport to the plant, installation and commissioning, training, documentation, and the first spare-parts kit. Duty treatment depends on the machine’s customs classification, its country of origin, any trade agreements between the export and import markets, and whether the unit arrives fully assembled or as components assembled locally. A qualified customs broker can confirm the classification and current duty rate for the specific HS code before the quote is accepted.
Budgeting should also account for the time value of a longer freight leg. A machine that takes an extra six to ten weeks to reach the site delays the labor savings and capacity benefit that justified the purchase, and a plant racing a peak season or a product launch can find that the cheaper freight route costs more in missed operating time. Where the duty schedule itself is under review, ask suppliers how they price duty risk into the quote, and whether the PO fixes the freight basis (FOB, CIF, delivered to site) so cost responsibility is clear at handover.
End-of-line equipment lead times sourcing: lead-time bands, pricing conditions and spare-parts availability
Buyers planning a 2026 purchase should hold a realistic picture of how long each format typically occupies in the supply queue. The bands below are planning ranges seen on real quotations, not guaranteed specs; actual dates depend on shop load, configuration, component supply and freight route. Semi-automatic case sealers and bench or semi-automatic strappers are often stocked or built quickly, because their structure is simple and formats repeat. Automatic inline sealers, adaptive tape or hot-melt sealers, turntable stretch wrappers and inline shrink wrappers usually sit in a moderate build band, with format and conveyor scope setting the upper end. Rotary-arm and ring wrappers, high-speed strappers, robotic or conventional palletizer cells and shrink tunnels with heated ovens carry the longest schedules, because they involve integration, robot or oven lead parts, guarding and commissioning.
Pricing conditions move with the same cycle. In busy periods, suppliers hold a quote valid for a shorter window, commonly a few weeks rather than months, because steel, component and freight costs can shift between quote and order. Where the market runs calmer, quote validity stretches and suppliers negotiate payment terms more flexibly. Currency movement on cross-border orders adds a second pricing risk: a machine priced in one currency can change effective cost if the buyer’s currency moves before payment. The 2026 packaging equipment price inflation outlook covers how material, component and labor cost drift shows up in machine pricing, and how to budget against it.
Payment milestones on new equipment commonly split between a deposit at order, progress payments as fabrication and testing reach agreed stages, and a balance payable before shipment or on handover. Deposit ratios and milestone split vary between supplier practice and market norms; the PO should state each milestone, the trigger for each payment, and what documentation or evidence accompanies it. Used machines often require full payment before removal, with inspection rights agreed before payment, which changes the buyer’s bargaining position if condition disappoints.
FAT and SAT are the acceptance gates inside that schedule. Factory acceptance test (FAT) runs at the supplier’s shop before shipment: the buyer agrees test loads, carton sizes, pallet dimensions, strap patterns, wrap settings and cycle counts, and reviews results in person or by video. Site acceptance test (SAT) runs after install on the buyer’s floor, against real product and real cartons or loads. A PO should define what FAT covers, what SAT acceptance criteria are, who pays for repeat trips if the machine fails acceptance, and how warranty start date aligns to SAT rather than to shipment. Skipping SAT criteria is one of the common reasons a delivered machine is called accepted before it actually matches the line’s real conditions.
Spare-parts availability after handover follows the supply route the buyer chose. Regional suppliers often hold common wear parts locally and reach the site quickly. China-based suppliers usually ship parts by freight, so critical wear parts should be ordered with the machine. Used units carry the parts-continuity risk described earlier: the older the model, the higher the chance a seal head, wrap carriage part or control board is no longer in active production. In any route, identify the parts that stop the line if they fail, agree who stocks them, and size a starter kit for the first year rather than waiting for a failure to source from scratch.
| Supply signal | What it means | Buyer action |
|---|---|---|
| Steady packaging equipment investment, with end-of-line machinery inside an occupied supplier pool (PMMI, Freedonia, Statista context) | Delivery slots and quote-validity windows firm up earlier in busy periods; late specs queue behind ready orders | Start application review and quotation early; settle carton, load and layout data before asking for firm dates; lock lead-time milestones in the PO |
| Long-lead components in controls, drives and robot manipulators, alongside shared steel and conveyor inputs | The machine schedule waits on the slowest component, not on the weld shop | Ask suppliers which components drive the quoted date; reserve long-lead items early; verify control platform and robot model before order |
| Used and refurbished units attract more buyers when new lead times stretch | Good used units get picked over quickly; condition and parts support vary widely between sellers | Inspect wear, guarding and documentation against your own product range; confirm replacement parts remain available before paying |
| Cross-border duty schedules, freight and origin rules shift between markets (OECD trade context) | Two suppliers quoting similar machines can land at different total cost after duties and freight | Compare landed cost line by line; confirm HS classification and duty rate with a broker; fix freight basis in the PO |
| Warranty, parts shelf and service access differ by supply region and by new-versus-used status | Purchase price savings can disappear into downtime if parts wait on freight or are no longer supported | Define warranty scope and warranty start date; order a critical wear-parts kit with the machine; agree SAT acceptance criteria before release |
Geography, lead-time and budget context
Equipment capacity and end-use demand concentrate in the large producing economies, and suppliers with local fabrication or assembly in those markets tend to quote shorter lead times and easier integration support. Suppliers shipping from a single distant region expose the buyer to freight scheduling, customs clearance and install-team availability on top of the build itself. None of this means a buyer should rule out a distant supplier; it means the purchase agreement should account for geography explicitly, on schedule and on cost.
When planning lead time, work backward from the commissioning window. If the station must be running for a peak season, a product launch, a new warehouse handover or a capacity expansion, set the latest acceptable delivery date, then subtract install, SAT, operator training and buffer time for freight or customs delay. Compare that backward-built date against each supplier’s quoted schedule before negotiation. A machine that arrives two weeks after the peak misses the business case, even if it was cheap.
Budget context should cover more than the machine purchase price. Include delivery and freight, duties and clearance, installation and rigging, guarding and safety compliance, commissioning and SAT, operator and maintenance training, the first spare-parts kit, initial consumable stock, and any conveyor or interface work needed to tie the station to the existing line. Under-provisioning the surrounding scope is one of the common reasons a project lands over budget even when the machine quote looked clean. For a phased approach, fund the station with the clearest labor or capacity payback first, and stage the next automation step once measured results from the first station are in.
What this means for your buying decision
Pulling the outlook together with the supply-route comparison and the cycle mechanics, the practical decisions for a 2026 end-of-line purchase come down to the checks below. These are the points we run through with buyers before a quote leaves the application review stage.
- Put the order in early enough to hold a delivery slot. If your project has a fixed commissioning window tied to a launch, expansion or peak season, work backward from that date and start the application review and quotation process well before the purchase deadline. Have carton dimensions, pallet sizes, load weights, strap pattern, wrap pattern, SKU range and floor layout ready so a ready spec can take the open slot when the shop next has space.
- Score supply route on total landed cost, not base price. Build the comparison across machine price, export packing, freight, insurance, duties, clearance, inland delivery, install, commissioning, training and the first parts kit. Confirm the customs classification and current duty treatment with a qualified broker, and write the freight basis (FOB, CIF or delivered to site) into the PO so cost responsibility is clear at handover.
- Match the supply route to the station’s role. Anchor stations on high-volume lines, compliance-critical stations and integrated palletizer cells generally favor new machines with regional or accountable supply, where warranty, service access and documentation matter. Second shifts, temporary peaks and low-priority lines can make a used or refurbished unit workable, provided inspection and parts support check out.
- Lock commercial terms that survive a busy cycle. The PO should state quoted lead time by milestone, pricing validity, component back-order handling, freight basis, deposit and progress payment schedule, installation scope, FAT and SAT acceptance criteria, warranty coverage and start date, and the spare-parts commitment. A busy market is not the time to leave those items open; where the contract is silent, schedule and cost pressure tend to shift onto the buyer.
- Test before commitment, not after delivery. Agree FAT test loads, cartons, pallets, strap and wrap settings and cycle counts with the supplier, and review results in person or by video. Define SAT acceptance on your real product and real line conditions, and specify who covers repeat travel if the station fails acceptance. Require tests on your actual cartons and loads rather than a clean demo sample running someone else’s packaging.
- Reserve spare parts alongside the machine purchase. List the wear parts that stop the line if they fail, confirm whether they are stocked locally, by the supplier or by a distributor, and order a critical starter kit with the order. When the market runs busy, aftermarket parts wait in the same queue as machine builds; parts on site protect the first year of production against a long replacement lead time.
- Verify used-machine condition against your own application before buying on price. If budget points you toward a refurbished sealer, wrapper, strapper or palletizer, inspect gearbox and bearing wear, seal heads and feed channels, wrap carriage and film path, guarding and safety compliance, control condition and documentation. Confirm replacement parts remain available, and test the machine against your actual cartons and loads. Purchase-price savings can disappear into downtime if the machine was built for a different job.
None of these points depends on a precise segment forecast that one research firm might dispute. They follow from the directional top line: steady packaging equipment investment, occupied supplier shops, moving component and freight conditions, and trade rules that vary by region, plus the station-level capacity, labor, mix and compliance pressures we see in real projects. The machine choice still starts from your own line: what cartons and loads you run, what rate you need, what shifts the station covers, and what support you can rely on after handover.
Frequently asked questions
How long do end-of-line equipment orders take in 2026?
Planning bands depend on format and configuration. Simple semi-automatic sealers and strappers are often stocked or built quickly; automatic inline sealers, turntable wrappers and inline shrink wrappers sit in a moderate build band; rotary-arm wrappers, high-speed strappers, robotic or conventional palletizer cells and heated shrink tunnels carry the longest schedules because of integration, long-lead components and commissioning. Ask each supplier to split the quoted date into fabrication, component supply, factory test, shipment and site commissioning, so you can see where delay risk sits.
Should I buy new, used or refurbished case sealers and wrappers in 2026?
New machines fit anchor stations on high-volume lines, compliance-critical positions or any case where you need current design, a fresh warranty and an active parts catalog. Used as-is units suit second shifts, temporary peaks or low-priority lines, with inspection and parts continuity checked before payment. Refurbished units sit between the two, with rebuild depth and limited warranty varying by seller. Match the route to the station’s role in your line, not only to the purchase price.
What is the difference between a regional supplier and a China-based supplier for sourcing end-of-line machines?
Regional builders typically quote shorter freight legs, closer parts and service access, local support for commissioning, and documentation aligned to destination-market norms, at a higher base price. China-based builders often compete strongly on base machine price for standard configurations, but landed cost adds freight, insurance, duties, clearance, inland delivery and overseas commissioning, and spare parts usually arrive by freight rather than from a local shelf. Compare total landed cost and after-handover service access before deciding.
How do tariffs and trade duties affect the landed cost of imported packaging equipment?
Duties apply to the machine’s customs classification, its country of origin and the trade agreements between the export and import markets, and they layer onto freight, insurance and clearance costs on top of the base price. A broker can confirm the HS code and current duty rate for the specific machine before the quote is accepted. Where duty rules are under review, ask how the supplier prices that risk, and fix the freight basis in the PO so responsibility for landed cost is stated clearly.
What should I lock in the purchase order to protect lead time, pricing and parts support?
State lead time by milestone, quote-validity window, deposit and progress payment triggers, component back-order handling, freight basis, FAT and SAT acceptance criteria, warranty scope and start date, training scope and the spare-parts commitment. Define who covers repeat site travel if acceptance fails, and order critical wear parts with the machine rather than waiting for a first failure. Silent terms in a busy market tend to shift schedule and cost pressure onto the buyer.
References: PMMI — market research on packaging machinery and end-use markets, Freedonia — packaging machinery demand and supply outlook, Statista — industrial equipment and price context, OECD — trade, tariffs and manufacturing context, Interpack — packaging and processing trade fair industry context.