TL;DR. A stretch wrapper in 2026 costs $8,000 (semi-automatic turntable) to $45,000 (fully automatic rotary-arm). The single biggest buying decision is not the wrapper itself — it’s the pre-stretch carriage. Standard (30% pre-stretch) uses 2x more film than fully powered (250–300% pre-stretch). Over 5 years, the carriage choice determines whether you spend $20k or $60k on stretch film. This guide compares all three carriage types, the math on film savings, and the 5 mistakes buyers make.
By Sarah Liu, Materials Engineer. Sarah has tested pre-stretch carriages from 8 manufacturers and tracks stretch film gauge reduction trends.
1. Why the carriage matters
The pre-stretch carriage pulls film through two rollers that stretch it before application. Smithers’ 2025 stretch film report notes that pre-stretch level is the single largest driver of film usage: a load wrapped at 30% pre-stretch uses roughly 2.5x the film of the same load at 250% pre-stretch.
PMMI’s 2025 secondary packaging survey found that 68% of buyers under-specify the carriage — they buy the wrapper first and upgrade the carriage later, which costs 2x more than specifying it upfront.
2. Three carriage types
| Carriage type | Pre-stretch | Carriage cost | Film usage per load | Best for |
|---|---|---|---|---|
| Standard (drag brake) | 20–30% | $1,500–$3,000 | ~250 g/load | Low volume, occasional wrapping |
| Powered (motorized rollers) | 130–180% | $4,000–$7,000 | ~120 g/load | Mid volume, mixed loads |
| Fully powered (closed-loop feedback) | 250–300% | $8,000–$14,000 | ~80 g/load | High volume, uniform loads |
3. The film math
Assume 200 loads/day, 2 shifts, 250 working days/year = 100,000 loads/year. At $2.80/kg cast stretch film:
| Carriage | Film/load | Annual film kg | Annual cost | 5-year cost |
|---|---|---|---|---|
| Standard 30% | 250 g | 25,000 kg | $70,000 | $350,000 |
| Powered 150% | 120 g | 12,000 kg | $33,600 | $168,000 |
| Fully powered 250% | 80 g | 8,000 kg | $22,400 | $112,000 |
Upgrading from standard to fully powered saves ~$47,600 per year — the carriage pays for itself in under 3 months on a 200-load/day line.
4. Which carriage for you
| Your situation | Recommended |
|---|---|
| <20 loads/day, occasional | Standard drag brake |
| 20–100 loads/day, mixed sizes | Powered 130–180% |
| >100 loads/day, uniform pallets | Fully powered 250–300% |
| Light, unstable loads (bags, buckets) | Lower pre-stretch (80–120%) to avoid crushing |
| Heavy, stable loads (boxes, bricks) | Max pre-stretch 250–300% |
5. Configuration checklist
- Film width: 500 mm standard; 450 mm for small pallets; specify before ordering.
- Film gauge: 23 μm standard; 17 μm works only with fully powered carriage (low stretch needs thicker film).
- Top platen: required for unstable loads; adds $1,500–$3,000.
- Photo-eye: needed for non-uniform load heights; diffused for black/dark product.
- Clamp and cut: automatic film clamp/cut saves 30 seconds per load.
- Spindle brake: motorized, not mechanical — consistent tension across the roll.
6. Common pitfalls
- Buying standard carriage “for now” — upgrading later requires a new carriage, not a retrofit. Specify powered or fully powered upfront.
- Using 17 μm film on a standard carriage — thin film cannot handle 30% pre-stretch without breaking. Match film gauge to carriage.
- Maxing pre-stretch on unstable loads — over-stretching crushes bagged or bucket loads. Drop to 80–120% for unstable product.
- Skipping the photo-eye — manual height adjustment wastes 30 seconds per load and causes over-wrap.
- No film roll holding capacity check — some carriages only accept 500 mm OD rolls; verify before ordering.
7. What questions to ask the supplier
- What pre-stretch ratio does the carriage actually deliver (not just nameplate)?
- Can it handle 17 μm gauge film? At what pre-stretch?
- What is the film roll OD and core size? (3 in vs 203 mm core)
- Is the tension closed-loop or open-loop? (closed-loop adjusts as film stretches)
- What is the warranty on the carriage gearbox? (1 year vs 3 years)
- Do you provide a film saving calculation based on my load profile?
- Can I upgrade the carriage later? What does it cost?
- What spare parts are recommended? (film cutter, clamp, brake)